June2016
BeneTerra completes difficult pipeline corridor rehab
Our Aussie team recently completed a very difficult rehabilitation of a pipeline corridor in central Queensland. Previous contractor’s attempts at erosion control had failed. and The worst section was 120 metres long and the average slope was 30% slope.