BeneTerra has successfully rehabilitated over 150 sites across Queensland that were previously disturbed by industry. By re-establishing soil profiles to reflect the surrounding natural environment, we have enabled these sites to be returned to their original landholders in as good or better condition than before the disturbance.
Land rehabilitation is not just about reshaping ground and replanting vegetation. It requires a deep understanding of how soil chemistry and structure, landform design and construction methods interact over time and how those interactions affect long-term stability, productivity and regulatory compliance.
BeneTerra specialises in rehabilitating disturbed land across coal seam gas, mining, landfill and infrastructure projects, restoring sites to regulatory and landholder requirements with properly certified outcomes. Since 2002, we’ve delivered rehabilitation programs across Australia and the United States including well pads, ponds, pipeline corridors and storage facilities with zero compliance failures.
Our integrated approach brings soil scientists, engineers, erosion specialists, project managers and civil works crews together as one coordinated team, ensuring rehabilitation constructability in the field and stands up to regulatory scrutiny.