BeneTerra was engaged to repair the damage, design integrated erosion and water-flow control and establish a stable surface capable of withstanding intense rainfall for years to come.
A 100-metre section of gas pipeline right of way—known onsite as the “Hill of Horrors”—had experienced repeated erosion failures under previous contractors.
Steep gradients, dispersive soils and the absence of effective water controls had caused deep gullies to form, exposing the pipeline to future risk.