Aussie team finishes complex pond site rehabilitation

Our Aussie team recently finished a complex pond site rehabilitation. It was an unlined earthen pond that held produced water for coal seam gas exploration. Prior to performing the work an extensive soil and groundwater survey was done.

The rehabilitated footprint was 8 ha (20 ac). We treated soil layers with heavy gypsum applications (depicted) and strategically inverted the pond floor. We selectively replaced soil from batters and local stockpiles to create a new soil profile. Intensive on-site soil sampling (depicted) guided the effort. Recent rains have the new pasture off to a good start.

Related News

BeneVap BV300 Rhonda was mobilised yesterday to our first customer site utilising our NSW EPA Mobile Treatment Licence. This is…

BeneTerra has been granted a mobile treatment licence by the NSW EPA for our BeneVap technology to treat landfill leachate….

We are pleased to share that the construction of Cell 5 at Gatton Landfill has been completed. Our strategy of…

It was 10 years ago this month – September 2013 – that BeneTerra commenced its first contract utilising our skill…

We are very proud to have received the news that Nikita Sharma has been awarded the Young Professional Scholarship 2023 by the Waste…

BeneTerra has successfully been verified as a Local Buy pre-qualified supplier for Engineering and Environmental Consultancy Services LB312. This verification…

Solving complex land and water challenges – with practical expertise and proven technology.

At BeneTerra we deliver practical, cost-effective environmental solutions to clients in the resources, industrial, agricultural and waste sectors.